logo horz

Rt. 6 Bridge Work-Lane Closures to begin July 27th

U.S. 6 bridge work to repair damaged beam will begin July 27. Lane closures will follow. See the News & Info tab for more information.

Newsflash

IDPH Weekly County COVID update

Thank you to our partners at Illinois Valley Community Hospital for forwarding the IDPH bulletin to the City.

Veterans Banner Order Form

U.S. 6 bridge work at Peru begins July 27
Removal/replacement of damaged beam at Illinois 251

OTTAWA – The Illinois Department of Transportation announced that repairs to a damaged beam on the bridge that carries Fourth Street (U.S. 6) over Illinois 251 in Peru begin July 27.

The work will require intermittent daytime lane closures on Illinois 251 in both directions. The second phase of repairs begins Aug. 4, when Illinois 251 will close at the U.S. 6/Illinois 251 interchange to remove and replace the damaged beam, as well as the following ramps:

• Southbound Illinois 251 to eastbound U.S. 6
• Northbound Illinois 251 to westbound U.S. 6
• Eastbound U.S. 6 to northbound Illinois 251
• Westbound U.S. 6 to southbound Illinois 251

U.S. 6 over Illinois 251 will remain open to through traffic during the work, and detours for Illinois 251 traffic will be posted. All work is expected to be complete Aug. 5.

Motorists can expect delays and should allow extra time for trips through this area. To avoid the work area, when feasible, use of alternate routes should be considered. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

For IDOT District 3 updates, follow us on Twitter at @IDOTDistrict3 or view area construction details on IDOT’s traveler information map on GettingAroundIllinois.com.

Summer Programs to begin Monday, June 22nd with 3 programs including Arts and Crafts, Tennis and Fitness in the Park. These programs will run over a 6 week period. PLEASE SEE ATTACHED FLYER FOR MORE INFORMATION 

Summer Recreation Programs

~Summer Camps to begin on Monday, June 29th

Summer Camps 2020 Sign Up

~Splash Pad-Opening Monday, June 29th

~Safety precautions for summer programs will be in place in alignment with state guidelines.

MOVIE IN THE PARK-Centennial Park

Friday, June 26th-Steve Sharp Band (6pm-9pm)

Friday, July 10th-River Band Trio (6pm-9pm)

Friday, July 24th-Dick, Wally, Darrell (6pm-9pm)

Friday, July 31st-3 Day Weekend (6pm-9pm)

Friday, August 28th-Steve and Steve (6pm-9pm)

September 12th-She's A Maybe (6pm-9pm)

September 26th-Fiddle Rock (6pm-9pm)

Personal coolers are welcome. Glass bottles are not permitted.

Safety precautions will be in place including circles painted in the grass with limitations of 10 people within the circle. Please wear masks when not in your chosen circle.

Don't forget to bring your lawn chair or blanket and enjoy the music, see you all there!

2020-Electronic-Recycling-Event s

 

Pool Study/Presentation